# 30-day plan

Glossary term, read 8 Nov 2026

**The short answer.** The switch guide for one incumbent, in four weeks: export in the order its ledger row says, map and cleanse, import and run in parallel, cut over and check. Each plan ends with the move's cost at 150 people on the calculator's assumptions. For enterprise suites the four weeks are a quarter and the plan says so.

## An example, sourced

Leaving BambooHR at 150 people is 55 People hours, £3,598 of overlap for three months and five weeks; leaving Rippling at 300 with payroll moving is 176 hours and eight weeks.

## Why it matters when choosing

On this site the term appears in the Migration Ledger or a switch guide; the example above was read on 8 Nov 2026 from the page linked under Sources, and the ledger's rows say "not published (checked 8 Nov 2026)" where a vendor publishes nothing.

## Sources

- https://www.bamboohr.com/legal/data-processing-agreement (read 8 Nov 2026)

Last reviewed 10 Nov 2026. Canonical: https://hrisalternatives.com/glossary/30-day-plan/
