# People hours

Glossary term, read 8 Nov 2026

**The short answer.** The hours of People team time a move takes, counted per hundred employees for each step: export, cleanse, import, parallel run and employee communication. The calculator's defaults are the site's own assumptions, printed on its page, and they scale with the incumbent's ease-of-leaving grade and the destination's import tools.

## An example, sourced

At 150 people a move from a grade A incumbent to Shapes is 55 People hours; from Rippling (grade D) 73; from Factorial (grade E) 82, all at £45 an hour on the calculator's assumption.

## Why it matters when choosing

On this site the term appears in the Migration Ledger or a switch guide; the example above was read on 8 Nov 2026 from the page linked under Sources, and the ledger's rows say "not published (checked 8 Nov 2026)" where a vendor publishes nothing.

## Sources

- https://shapes.co/releases/build-your-directory-from-a-spreadsheet (read 8 Nov 2026)

Last reviewed 10 Nov 2026. Canonical: https://hrisalternatives.com/glossary/people-hours/
